The bill of material / routing module maintains the engineering
data on both the product and manufacturing process. Bills of material and
process routings can be maintained separately or synchronized.
In/out effectivity dates control which BOM/routings are synchronized
with MRP. In/out dates are tracked and provide the capability to
view any BOM/routing as it existed, or will exist, at any point
past, present or future.
The
engineering change order (ECO) process assures changes are not done prematurely,
ECO functionality allows you to discipline the various engineering processes. Use the formal ECO process or the
less formal revision process for controlling bill of material and routing changes.
Sign offs are made easier by electronic, customizable approval
levels that assure ECOs are approved before implementing.
WinMAGI's
use of lead time offsets establishes more precise due dates for
parts needed at different times in the assembly process. Alternate
BOM/routings provide flexibility in the manufacturing process.

Copyright 2008 - Manufacturing Action Group Inc. - All Rights