866 946 6244  
Contact MAGI  


    616 956 5345 Phone  

    616 956 5362 Fax   

 

 

 

 
Quality... Integrity... Reliability...
Engineering

Complete engineering control.

bullet

Bills of material and routings

bullet

Engineering change control

bullet

In/out effectivity dates

bullet

Electronic approval process

bullet

Supports configurable products

bullet

Component mass replace

bullet

Same as except capability

bullet

Phantom part numbers

bullet

Unlimited parts and levels 

bullet

Unlimited reference remarks 

bullet

Machine and labor standards in pieces/hour or hours/piece

bullet

User defined decimal precision

bullet

Link to drawings

bullet

BOM/routing major error audit

bullet

"As of" BOM/routing visibility

bullet

Revision history

bullet

Supports lead time offsets

bullet

Supports alternate BOM/routings

The bill of material / routing module maintains the engineering data on both the product and manufacturing process.  Bills of material and process routings can be maintained separately or synchronized.  In/out effectivity dates control which BOM/routings are synchronized with MRP. In/out dates are tracked and provide the capability to view any BOM/routing as it existed, or will exist, at any point past, present or future. 

The engineering change order (ECO) process assures changes are not done prematurely, ECO functionality allows you to discipline the various engineering processes. Use the formal ECO process or the less formal revision process for controlling bill of material and routing changes. Sign offs are made easier by electronic, customizable approval levels that assure ECOs are approved before implementing. 

WinMAGI's use of lead time offsets establishes more precise due dates for parts needed at different times in the assembly process. Alternate BOM/routings provide flexibility in the manufacturing process.

 

 

Copyright 2008 - Manufacturing Action Group Inc. - All Rights Reserved

4695 44th Street SE Suite B-130, Grand Rapids, Michigan 49512  USA